Bidora Estimation Design — 80 services · 8 disciplines

Multidisciplinary engineering · USA

Drawings, engineering and estimates that agree with each other.

Permit-ready architecture, structural and MEP engineering, shop drawings, BIM and construction estimates for contractors, developers, designers and homeowners. One team works every discipline, so conflicts get resolved in the model, not in the field.

Permit sets delivered in [00] states for [000] clients since [year].

Layers
LIVING + KITCHEN BEDROOM BATH 28′-0″ 20′-0″ 3′-0″ ENTRY DOOR 6′-0″ WINDOW, TYP. ADU · 560 SF · CONCEPTUAL A B C 1 2 B1 B2 CONT. FTG — TYP. AHU-1CU-1 8″Ø SUPPLY WH 4″ SAN P-1
A101 · FIRST FLOOR PLAN · 1/4″ = 1′-0″ CONCEPTUAL — FOR ILLUSTRATION

Coordination, not decoration

One model. Every discipline, checked against each other.

Toggle the drawing layers to isolate each trade, exactly as our coordinators do before a set is issued. Then watch a real clash get found and fixed in the model — before it ever reaches the field.

A101 · FIRST FLOOR PLANCOORDINATED MODEL
LIVING + KITCHENBEDROOMBATH 28′-0″ 20′-0″ A B C 1 2 B1 B2 CONT. FTG — TYP. 8″Ø SUPPLY AHU-1CU-1 WH 4″ SAN P-1
13 CAD LAYERS · XREF’D IN ONE MODELCONCEPTUAL — FOR ILLUSTRATION

Drawing layers

A — ARCHITECTURE

S — STRUCTURE

M — MECHANICAL

P — PLUMBING

E — ELECTRICAL

Coordination check · live example

SECTION A–A · BEAM B1 vs SUPPLY DUCT B1 · 11-7/8″ × 14″ GLB 12″×8″ SUPPLY 12″×8″ SUPPLY · BELOW B1 CLASH RESOLVED R2 → R3 · FIXED IN-HOUSE BEFORE ISSUE

Supply duct ran into beam B1. The overlay flagged it in the R2 review — run the check to see the fix.

Sheet info

SHEET
A101 — FIRST FLOOR PLAN
SCALE
1/4″ = 1′-0″
REVISION
R3 — COORDINATED SET
STATUS
[for review]
DRAWN / CHECKED
[initials] / [initials]

What we do

80 TOTAL

Eighty services in eight disciplines.

Order a single sheet or the whole set. When we handle more than one discipline, we coordinate them in-house before anything is issued.

A · 14 SERVICES

Architectural

Permit sets for new homes, ADUs, additions and tenant improvements, drawn to the code your jurisdiction has adopted. For existing buildings, we start with as-built drawings.

  • 01Permit-ready drawings
  • 02New home design
  • 03ADU design
  • 04Residential additions and remodels
  • 05Commercial tenant improvements
  • 06Construction documents
  • 07As-built drawings
  • 08Building code review
  • 09Site plans
  • 10Floor plans
  • 11Elevations
  • 12Building sections
  • 13Wall sections
  • 14Details and schedules

Often paired with: Structural Engineering · MEP Engineering

S · 10 SERVICES

Structural Engineering

A load path you can follow from roof to footing, in wood, steel, concrete or ICF, with the calculations a plan checker asks for.

  • 01Structural calculations
  • 02Foundation design
  • 03Framing plans
  • 04Beam and column design
  • 05Wood, steel and concrete structures
  • 06Retaining wall design
  • 07Structural letters
  • 08Structural reviews
  • 09ICF structural design
  • 10Permit review support

Often paired with: Architecture · Shop Drawings

MEP · 14 SERVICES

MEP Engineering

Mechanical, plumbing, electrical and fire systems sized by calculation, not rule of thumb. Manual J comes before the first duct is drawn.

  • 01HVAC design
  • 02Manual J, S and D calculations
  • 03Mechanical plans
  • 04Plumbing design
  • 05Drainage systems
  • 06Water distribution design
  • 07Electrical design
  • 08Lighting plans
  • 09Power plans
  • 10Panel schedules
  • 11Low-voltage systems
  • 12Fire alarm design
  • 13Fire protection design
  • 14Complete MEP packages

Often paired with: Architecture · BIM and Modeling

Z · 10 SERVICES

Shop Drawings

Fabrication and erection drawings for steel, rebar, millwork, cabinets and MEP trades, detailed so your shop can cut and your crew can set.

  • 01Structural steel
  • 02Miscellaneous steel
  • 03Rebar
  • 04Millwork
  • 05Cabinets
  • 06HVAC
  • 07Plumbing
  • 08Electrical
  • 09Fabrication drawings
  • 10Erection drawings

Often paired with: Structural Engineering · BIM and Modeling

BIM · 7 SERVICES

BIM and Modeling

Revit models at LOD 300 to 400, from design intent or from a point-cloud scan, with clash detection run before anything is installed.

  • 01Revit BIM modeling
  • 02BIM coordination
  • 03Clash detection
  • 04LOD 300–400 models
  • 05Scan to BIM
  • 06As-built BIM models
  • 07Construction coordination models

Often paired with: MEP Engineering · 3D Visualization

3D · 6 SERVICES

3D Visualization

Renderings and walkthroughs built from the actual drawings, so owners approve the building that will be built.

  • 013D renderings
  • 02Interior renderings
  • 03Exterior renderings
  • 04Walkthrough animations
  • 05Virtual presentations
  • 06Concept visualization

Often paired with: Architecture · BIM and Modeling

EST · 9 SERVICES

Estimating and Takeoffs

Takeoffs and estimates for bids, budgets and value engineering, each quantity traceable to the sheet it came from.

  • 01Quantity takeoffs
  • 02Material takeoffs
  • 03Labor estimates
  • 04Bid estimates
  • 05Budget estimates
  • 06Detailed cost estimates
  • 07Bid preparation support
  • 08Value engineering
  • 09Procurement assistance

Often paired with: Architecture · Shop Drawings

X · 10 SERVICES

Specialized Services

EV charging, solar PV, battery storage and solar carports, plus the permitting, RFIs and submittals that keep a project moving.

  • 01EV charger design and estimating
  • 02Solar PV systems
  • 03Battery energy storage (BESS)
  • 04Solar carports
  • 05Permit expediting support
  • 06Construction administration support
  • 07RFI and submittal assistance
  • 08Design-build support
  • 09Engineering reviews
  • 10Due diligence reports

Often paired with: MEP Engineering · Estimating and Takeoffs

Estimating & takeoffs

Estimates you can check against the drawings.

Every quantity is tied to a highlighted area, line or count on a specific sheet, so your estimator can audit a number instead of measuring it again. Select a row — or a highlight on the plan.

A101 · TAKEOFF PLANTRACEABLE QUANTITIES
LIVING + KITCHENBEDROOMBATH 600 SF467 SF LVP72 SF TILE
CLICK A HIGHLIGHT OR A TABLE ROW SAMPLE — NOT A QUOTE

Sample takeoff · CSI MasterFormat

DivisionItemQty
03 30 00Slab on grade, 4 in.600 SF
03 30 00Continuous footing98 LF
06 10 00Interior partitions, 2×442 LF
08 10 00Doors, with hardware4 EA
08 50 00Windows6 EA
09 65 00Resilient flooring, LVP467 SF
09 30 00Tile, bathroom floor72 SF

Sample net quantities before waste. Not a quote, not a complete project estimate. Each line traces to a sheet and a highlight.

Every trade. One coordinated estimate.

Organized the way bid forms are: by CSI MasterFormat division.

03Concrete
04Masonry
05Structural steel
05Miscellaneous metals
06Framing
07Roofing
08Doors and hardware
09Drywall and finishes
09Painting
09Flooring
21Fire protection
22Plumbing
23HVAC
26Electrical
31Earthwork
31–33Sitework
32Landscaping
32Irrigation
33–35Civil construction
Trade not listed?ASK US →

How we work

How a project moves through the office.

Six steps from the first email to the approved set, logged like revisions so you always know which version you are looking at.

  1. R0

    Transmittal

    You send what exists: sketches, photos, a survey, an old permit set or just an address.

    DeliverableA written scope and a fixed fee.
  2. R1

    Kickoff

    We confirm the code path, the disciplines involved and the dates.

    DeliverableA schedule with issue dates.
  3. R2

    Design

    A first pass of the drawings, for your markups.

    DeliverableProgress set, PDF.
  4. R3

    Coordination

    Architecture, structure and MEP are overlaid and checked against each other. Clashes get fixed in-house.

    DeliverableCoordinated set.
  5. R4

    Review and Issue

    Code review and a second set of eyes on every sheet before anything is issued.

    DeliverableIssued for permit, bid or construction.
  6. R5

    Plan Check

    We answer plan-check corrections and RFIs as they come in.

    DeliverableApproved set, plus native DWG and RVT files.

Post-permit

Still here after the permit: RFIs, submittals and construction administration support.

Sectors

Eleven building types, each with its own code path.

Occupancy classification comes first, because egress, fire separation, structure and MEP all follow from it.

Why us

What you can count on.

01

One Team, Every Discipline

Architecture, structure and MEP are drawn by people who work side by side and check each other’s sheets before anything is issued.

02

Drawn to Your Jurisdiction

We work to the code editions and local amendments your building department enforces, and list them on the cover sheet.

03

Numbers You Can Audit

Every takeoff line points to a sheet and a highlight, so your estimator can check a quantity instead of re-measuring it.

04

One Point of Contact

A single project lead answers your questions from the first sketch to the approved set.

05

Corrections Are Part of the Job

Plan-check comments come back on most projects. Answering them is part of our scope, not an afterthought.

06

Do Not Scale Drawings

Everything that matters is dimensioned. If a dimension is missing, that is ours to fix.

Have a project on the drawing board?

Send us your sketches, drawings, survey or project details. We’ll review the scope and outline the next steps.

Scroll to Top